রশিদপুর গ্যাস ফিল্ড

 

 

Rashidpur Field was discovered by Pakistan Shell Oil Company (PSOC) in 1960. A total of 11 wells have so far been drilled in this field. Gas production from this field is fed to North-South Pipeline. The drilling of Rashidpur-1 (RP-1) established the presence of two gas bearing intervals in the Miocene section known as the Upper Gas Sand (UGS) and the Lower Gas Sand (LGS). Rashidpur-2 (RP-2) was drilled at the same location as RP-1 in 1960/61 to evaluate the section below the LGS and it was concluded that all sands below the LGS would be water bearing. In 1989 under the Second Gas Development Project (SGDP), Rashidpur-3 (RP-3) and (RP-4) were drilled and completed as producers from the LGS. At the same time, RP-1 and RP-2 were worked-over and completed in the UGS and LGS respectively.

The drilling programme of three additional development/ appraisal wells under Gas Infrastructure Development Project (GIDP) was implemented from January 1999 to September 1999. The primary object of these three wells was to complete LGS as a producer, which is a main gas reservoir in the Rashidpur Gas Field. Other objectives were to collect the data of UGS for future development, along with the investigation of other potential hydrocarbon-bearing zones, such as the Middle Gas Sand (MGS) which was discovered by the drilling of RP-4. Rashidpur-8 was drilled under the Fast Track Program and production started from 27 August 2014. The drilling programme of three (RP-9. RP-10, and Rp-12) exploratory/appraisal cum development wells based on 3D seismic data were implemented from May 2016 to November 2016. The main objective of Rashidpur-9 (RP-9) was to explore the hydrocarbon potentiallity of sand below Upper Marine Shale and Completed UMSS. The main objective of Rashidpur-10 (RP-10) and Rashidpur-12 (RP-12) was to explore the continuity of lower Gas Sand (LGS). Due to no potential Hydrocarbon bearing zone RP-10 and RP-12 were suspended. Production from RP-2, RP-5 and RP-6 ceased from October 2007, June 2008 and January 2011 respectively.

Four gas process plants have been installed in the field to process the gas produced from the wells. These include (a) 60-MMCFD liquid desiccant glycol type plant, (b) 70-MMCFD solid desiccant (Silicagel) type gas processing plant and (d) & (e) 2X45 MMCFD silicagel type process plants. But one unit of 45 MMSCFD solid desiccant (Silicagel) type gas processing plant was relocated to Haripur Gas Field.